GETTING THE GREATEST VALUE FROM UNSEALED ROADS WITH POLYCOM

Getting the greatest value from unsealed roads with PolyCom Stabilising Aid

Reducing costs with PolyCom Stabilising Aid is the answer to cost-effective and efficient unsealed road management. Specially formulated to extend the life of unsealed roads, PolyCom reduces maintenance requirements by four to six times.


You can rejuvenate the existing road materials with PolyCom, building a stronger pavement without importing new quarry material. This is achieved by treating the material that exists on-site and mixing recovered material from table drains, whilst re-shaping the road to facilitate better drainage. 


PolyCom generates a road that is stronger, less slippery and requires less grading. No imported material is required. Major savings on gravel carting and purchase are available with this method as well as reduced maintenance.

When new quarry materials are required to maintain the level of the pavement, treating the re-sheet material with PolyCom enables road crews to reduce the thickness of new gravel by at least half, whilst building a pavement with the integrity to withstand water ingress and erosion. 


Councils can save resources by applying PolyCom to new re-sheet material during standard road maintenance, reducing the need for future grading interventions whilst maintaining higher quality road performance standards and more satisfied residents.


Significant cost advantages are available with PolyCom road stabilising, with little change to work practices.


PolyCom distributors assist road maintenance and construction crews on-site, working closely to train and educate them to ensure they achieve the best results from PolyCom Stabilising Aid.

How much PolyCom you need? Download the calculator

© Earthco Projects 2021

Earthco Projects Pty Ltd

NSW, VIC & TAS

PO Box 763, Woodend, 

VIC  3442


P 1800 790 907

E Contact Us